The bathroom did not have running water, a bucket was used to fill the gravity feed tank in back of the toilet, and all washing was done within the kitchen sink. A stand up shower stall found at the dump was installed along with a new bedistal sink and toilet complete with running water and lighting. One wall was moved out and double insulation was used within the wall between the shower and the adjacent bedroom for noise proofing. Traditional octagonal tiling was installed on the floor, and green board with plaster was used around the shower. |